Cleveland Browns Headquarters.

Berea, Ohio

PROJECT OVERVIEW

This $13 million dollar renovation and addition to the Cleveland Brown’s training center includes a new entrance lobby, expansion and renovation of the player, coach and staff locker rooms with the addition of both sauna and steam rooms. A new player’s lounge includes gaming areas, kitchenette, business center and barber chair, including sight lines to the practice fields. The physical therapy and training area doubled in size and is now accompanied by a natatorium housing a two-lane lap pool, polar plunge, thermal plunge and therapy pools. A two-story (4,500 sq ft) multi-purpose building offers employee a dedicated fitness area and serves as additional space for the team’s internal position drills. A new boardroom is perched atop the two-story lobby and the draft room has been expanded to provide further flexibility.The second floor executive suite has been carefully reorganized, enlarged and is positioned over the natatorium, incorporating an outdoor terrace overlooking the fields below.